A 5-Star Hotel-Sindhorn Kempinski Hotel Bangkok
Sindhorn Kempinski Hotel Bangkok is a 5 star hotel, this hotel is only a short drive from the Hindu Erawan Shrine and is near the metro station. We were fortunate to participate in the bidding for the hotel and to be the furniture supplier for the communal area and 274 rooms of the project. Living in a new luxury lifestyle, escape into nature without ever leaving the city, surrounded by the warm embrace of gardens for customer extended stay.

Public Area Bespoke Furniture
The furniture products of Harman Furniture covered all furniture types throughout Sindhorn Kempinski Hotel Bangkok. Solid furniture in the public area, such as reception desk, lobby build-in wall panel, corridor wallpaper, lobby bar fixed table and shelves.






Guest Room Custom Furniture
Guest room fixed furniture such as sliding door, foyer wall panel, build-in cabinet, bed screen, TV backboard, mini bar and wash room basin. And some movable furniture such as lobby lounge sofa, chair, table, restaurant dinner table and desk, meeting room chairs, bedroom bed, bedside stand, stool, arm chair and others decorative artworks.









Finished Products Protection
Harman Furniture is a furniture manufacturer with more than 20 years of experience in custom furniture for high-end hotels. We are very strict in the manufacture of furniture, and even more stringent in the final packaging.
- Five layers of packing shall be adopted for export packing
- Protective measures for transporting finished products
- On-site installation of finished product protection scheme
- Delivery
Installation
In the production of loose furniture and fixed furniture production and installation strictly comply with the highest industry standards. According to the geographical location and construction environment requirements of the project, due consideration should be given to the proper combination of specialties and types of work. Each type of work should be equipped with no less than 10% senior technicians. The main construction personnel should be engaged in this type of work for no less than 3 years, and special type of work supervisors should be appointed.
Contract Furniture Process
- We receive project information from owners, agencies, contractors, designers, or we receive an invitation to tender documents.
- FF&E Drawings Received.
- Discuss the technical details with the consultant and confirm details.
- Then we will start the quotation
- Sign the contract.
- Shop the product drawing.
- Mock-up or prototype production for customers to check.
- Bulk furniture full scale factory production.
- Products can be packaged after strict inspection and approval.
- It comes to the installation of build-in furniture and the placement of movement furniture.
- Full site inspection & review.
- And after-sales service begins when customer acceptance.
